Big State Solutions, LLC

We make the app that turns your estimate into a P6 schedule.

Big State Solutions is the family company behind Big State AI — the helper app schedulers and project-controls professionals use to get a quick .xer out of the estimate they already have. Founded by Louden Greiner, PMP, PSP, on seventeen-plus years of energy and infrastructure scheduling.

Import the estimate, get the schedule, refine it in your own tools. Plans and pricing at BigState.AI.

Big State Solutions consulting is on the shelf while our founder is engaged full-time on an infrastructure project in Alaska. Need a hands-on professional? Request a referral ↓

Big State AI — the app we make

Your estimate in. A real .xer out.

Estimates come in every form — an Excel table, a PDF, a plain-language description of the work. Big State AI reads what you already have and returns a real, logic-linked CPM schedule in the native file your tools import: Primavera P6 .xer and Microsoft Project .xml. It's an AI first draft, watermarked as one — your review as a qualified scheduler is what makes it yours, and P6 or MS Project stays the system of record.

Start from what you haveAn Excel estimate or takeoff, a PDF, a plain-language scope — or an existing .xer used as a reference.
A real CPM scheduleNative Primavera P6 (.xer) and Microsoft Project (.xml), logic-linked, with print-ready Gantt PDFs.
Basis of Schedule & narrativeThe documentation written for you — calendars, logic, durations, and assumptions explained, plus an executive summary.
Analyze, compare, progressDCMA-style health checks, baseline-vs-update comparison, and monthly progressing — keep the schedule alive through the job.
Coming nextPicture and Word-document intake; activity codes and resource assignments pulled from your company template dictionaries. Being built — not available today.
Sample output

This is what comes back.

Real Big State AI output across four kinds of work — generated from estimates and scopes, quality-checked, and watermarked as a first draft for scheduler review. The full gallery, with the native files, lives on the product site.

Generated by Big State AI from fictional estimates and scopes, watermarked as a first draft for scheduler review. Every package also includes the native Primavera P6 (.xer) and Microsoft Project (.xml) files.

Referrals

Need a person, not an app? We know good ones.

Our founder is currently engaged full-time on a major infrastructure project in Alaska, so Big State Solutions is not accepting new consulting engagements for the foreseeable future. To build, analyze, and update the schedule yourself, use Big State AI. If your project needs a dedicated scheduler or project controls professional, we're glad to recommend experienced colleagues from our network — practitioners with the same energy and infrastructure background. Send a short note about the project and we'll point you to the right person.

FAQ

Questions schedulers and PMs ask first.

What can I feed it?

The estimate you already have. Today that means an Excel estimate or takeoff, a PDF, a plain-language description of the work, or an existing .xer used as a reference. Picture and Word-document intake are being built and aren't available yet.

What exactly do I get back?

A complete drafting package by email: the native Primavera P6 (.xer) and Microsoft Project (.xml) schedule files, an auto-generated Basis of Schedule (.docx), a schedule quality review, and supporting outputs like look-ahead views, an executive summary, and a field-ready progress sheet.

Can I submit the schedule as-is?

No — and that's by design. Every output is a professional first draft that requires review by a qualified scheduler before it goes to an owner. It's clearly watermarked as such — not a certified deliverable.

Will the files import cleanly into our P6?

Yes. Big State AI writes native XER built to import directly into Primavera P6 — calendars, WBS, activity logic, and milestones intact — plus MSPDI XML for Microsoft Project.

How does pricing work?

Current plans and pricing live on the product site at BigState.AI.

What happens to my project data?

Client and project identity is stripped at the point of ingestion, and raw schedules are never kept or reused as library content. Full details in the privacy policy.

Can Big State Solutions just build or review it for us?

Hands-on consulting is on the shelf for the foreseeable future while our founder is engaged full-time on a major infrastructure project in Alaska. To build and analyze the schedule yourself, use our app, Big State AI. If you need a dedicated professional, request a referral and we'll connect you with an experienced colleague.

About

Meet the founder.

Louden Greiner, PMP, PSP — Founder, Big State Solutions, LLC
Louden Greiner, PMP, PSPFounder, Big State Solutions, LLC

Big State Solutions, LLC was founded by Louden Greiner, PMP, PSP on a skill he'd been practicing his entire career: taking large, complex project information and turning it into clear, organized plans and reports that people can actually use. It's the same problem artificial intelligence is now built to solve — work Louden was doing by judgment and discipline years before the tools existed.

That instinct was earned, not handed down. He learned his work ethic from his father on an Alaskan fishing boat as a boy, then worked his way up from the laborer ranks into the project controls office. He spent his twenties in what amounted to a project-controls boot camp — remote job sites, twelve-hour days, 300-plus days a year — alongside a top-tier team that lived and breathed schedule, including mentors who still ran the forward and backward pass by hand. From there he moved into owner-side roles with many of the top oil & gas operators, then took his experience on the road, supporting projects in every corner of the country.

Through all of it, one passion held: simplifying project controls and delivering real value to the people who get the work done — from the project manager to the field hand. He started Big State Solutions to give that hard-won knowledge back, the way his own mentors once did for him.

“I'm grateful for the opportunities, but the challenges are what shaped me.”

Today that field-tested judgment — Primavera P6 and Microsoft Project, to AACE International (PSP) and PMI (PMP) standards — went into building Big State AI, so a scheduler can get a working draft out of an estimate in minutes. Hands-on consulting needs are met through a trusted referral network.

Big State Solutions is a family company, built on faith, gratitude, and the belief that hard-won knowledge is meant to be given back.

Founded 2016Ten years of independent project controls practice.
17+ years in the fieldFrom the laborer ranks to the owner's side of the table.
$20B+ planned & scheduledFrom a $2MM pipeline assurance job to a $9.7B offshore wind farm.
15 industriesUpstream, midstream, offshore, marine, turnarounds, modular fab, infrastructure, wastewater, power & fiber, and more.
9 states + the Gulf of MexicoRemote Alaska slopes to Gulf platforms — and one platform bound for the other side of the world.
The callback recordThree separate engagements with the same major over four years; by 2024, three owner teams shared his time at once.
PSP & PMP certifiedAACE International and PMI standards; native in Primavera P6, MS Project, TILOS, and Acumen Fuse.
Early access

Try it on your next estimate.

Leave your email and we'll send you what you need to get started with Big State AI — no spam, just your way in.